Frame |
External and partition walls | Planed kiln-dried board 96х46 mm | 2 mln ₽ |
Floor beams | Planed kiln-dried board 146х96 mm | ||
Rafters | Planed kiln-dried board 146х96 mm | ||
Thermal insulation | Rockwool Light Batts stone wool (or analogue from other manufacturers) Floor - 15 cm, walls - 10 cm, ceiling - 15 cm |
||
Partition walls soundproofing | Rockwool Light Batts stone wool | ||
Waterproof | Ondutiss / Izospan membrane | ||
Exterior finishing |
Roof | Corrugated galvanised iron MP-20 0,4 mm, corner elements, drainage system | |
Walls | ОSB, soft wood planken, acrylic varnish | ||
Entrance door | Door with thermal break | ||
Interior finishing |
Walls and ceiling | Soft wood planken, acrylic varnish | |
Bathroom walls | Moisture resistant drywall 12,5 mm, tile | ||
Bathroom floor | Tile | ||
Bathroom door | Flush door | ||
Glass fixing |
Facade windows | Aluminium energy-efficient double glazed units with thermal break:
- hopper 120х50 cm - 2 pcs. - fixed 178х162 cm - 1 pc. |
|
Lighting |
Interior lighting | Surface mounted LED luminaires | |
Utility system |
Water supply and sewage | Water heater Thermex Flat Plus Pro IF 50V, heating cable | |
Electrical | Concealed wiring, built-in electrical panel, switches | ||
Ventilation | Duct exhaust fan, ventilation supply valve | ||
Heating | Electric convector - 2 pcs., Underfloor heating in the bathroom | ||
Furniture and plumbing |
Kitchen and wardrobe | Chipboard Egger | |
Refrigerator | Daewoo fr-081ar, volume - 88 l | ||
Washer | Cut-in, stainless steel | ||
Tap | Grohe BauFlow 23632000 | ||
Stove | Cooktop Hansa BHC36106 | ||
Lavatory basin | Floor standing Gesso W103 | ||
Sink | Laufen PRO S 815961 (450х340х145 cm) | ||
Shower | Grohe Vitalio Go 26196000 | ||
Table | Solid oak, water-based varnish | ||
Chairs | Delo, TRU model | ||
Bed | Solid pine, water-based varnish, lifting mechanism, internal storage system | ||
Mattress | 160х200 cm | ||
Blanket | 200х200 cm | ||
Pillows | 50x70 cm - 2 pcs. | ||
Linens | Delo | ||
Production time |
2 months |
Moscow | St. Petersburg | |||
Foundation |
Recommended foundation: 6 screw piles 108/4/2500 mm (8 piles - for the terrace). The cost of the foundation depends on the location, the type of soil, the length of the piles, the need to remove stones, etc. It is recommended to take a soil sample and conduct examination of the site | 28 000- 33 000 ₽ (in 100 km from Metallostroy) |
||
Wastewater treatment station |
Zorde-4 (for 2-5 people) |
Erection: excavation, digging, submersion of the station, backfilling of the central heating station (ratio of cement to sand 1/4, 1/3) connection of electrics, pumping equipment, welding of branch piping, inspection and laying of pipes up to 10 m, lead -into the house | ≈ 145 000 ₽ | ≈ 125 000 ₽ (in 100 km from city) |
Kolo Vesi premium station |
Kolo Vesi 3 (for 2 people) | ≈ 175 000 € (+50 ₽ for each 1 km from Moscow Ring Road)" |
≈ 155 000 € | |
Kolo Vesi 5 (for 4-5 people) | ≈ 200 000 ₽ (+50 ₽ for each 1 km from Moscow Ring Road) |
≈ 180 000 ₽ | ||
Module delivery |
The module is transported to the customer's site in assembled form. Delivery is carried out by a transportation company using a cargo trawl. | ≈ 100 000 ₽ | ≈ 35 000 ₽ (in 60 km from city) |
|
Unloading the module |
Executed on the site using a crane. |