House with finishing |
Built-up area | 108.6 m² | ≈ 16 mln ₽ |
Usable floor area | 87.5 m² | ||
Terrace | 20.6 m² | ||
Dimensions (LхWхH) | 18.6 m х 6.6 m х 4.5 m | ||
Frame |
External walls, partitions | Planed kiln-dried board 146х46/ 96x46 mm | |
Rafters | Planed kiln-dried board 146х46 mm | ||
Heat insulation | Rockwool Light Batts stone wool (or analogue from other manufacturers) walls - 200 mm, ceiling - 200 mm; MDVP Beltermo 35 mm |
||
Noise insulation of interior walls | Rockwool Light Batts stone wool 100 mm, plywood 10+10 mm | ||
Wind and vapor barrier | Delta-Dawi GP film, MDM Ventia Bronze membrane, Delta Multi-Band M60 tape, MDVP Beltermo 35 mm |
||
Outside finishing |
Roof | Profiled flooring MP-18 0.5 mm, corner elements, drain | |
Walls | MDVP 35 mm, cedar planken, antiseptic oil, stainless steel fasteners | ||
Terrace | Larch deck board 120х28 mm Floor lags: planed kiln-dried board 146х46 mm, screw piles |
||
Interior finishing |
Walls and ceiling | Cedar planken, oil/paint, gypsum board, ceramic granite | |
Floor | Terazzo tile 28 mm | ||
Doors | Сoncealed doors | ||
Glass fixing |
Facade windows | Energy-saving double-glazedwindows with thermal break | |
Entrance door | Thermal insulated door Alutech Аlt W72 | ||
Lighting |
Interior lighting | Surface mounted LED luminaires | |
Utility system |
Water supply and sewage | Water supply (metall-plastic pipe 16х2,0, AlcaPlast shower gulley, AlcaPlast Sadromodul toilet installation system AM101/1120 without bowl), electric boiler Protherm Skat (Ray) V14 14 кВт, three-waly velves FUGAS for SKAT boiler (11 and 13 versions) Protherm, remote control unit for Vaillant GSM-Climate ZONT H-1V eBUS boilers, floor mounted inderect water heater Stout 200 l, input unit with filter bypass | |
Electrical | Concealed wiring, built-in electrical panel, switches | ||
Ventilation | Air supply valves, air removal by humidity and CO2 sensors | ||
Heating | Water underfloor heating 12 cm (collector with flow meters and thermostatic valves with 12 outputs, PE-RT EVOH 16х2,0 pipe with oxygen barrier, tubing panels 75х1231х831 mm, pump-mixing unit MVI 1, heating system pump Unipump UPС 25-60 130) | ||
Production time |
5 months |
Furniture and plumbing |
Kitchen and wardrobe | Chipboard Egger | ≈ 3 mln ₽ |
Refrigerator | |||
Washer | |||
Tap | |||
Stove | |||
Lavatory basin | |||
Sink | |||
Shower | |||
Washing machine | |||
Sofa | Delo | ||
Tables | Delo, Kroogster and Yo models | ||
Chairs | Delo, Tu and Yo models | ||
Bed | Solid pine, water-based varnish | ||
Matress | 160х200 cm | ||
Blanket | 200х200 cm | ||
Pillows | 50x70 cm | ||
Linens | Delo | ||
Tablware | Delo | ||
Foundation |
The cost of the foundation depends on the location, the type of soil, the length of the piles, the need to remove stones, etc. It is recommended to take a soil sample and conduct inspection | ||
Concrete slab | |||
Wastewater treatment station |
Zorde-4 (for 2-5 people) |
Erection: excavation, digging, submersion of the station, backfilling of the central heating station (ratio of cement to sand 1/4, 1/3) connection of electrics, (100 km from the pumping equipment, city) welding of branch piping, inspection and laying of pipes up to 10m, lead -into the house | |
Kolo Vesi premium station |
Kolo Vesi 3 (for 2 people) | ||
Kolo Vesi 5 (for 4-5 people) | |||
Terrace |
20 m2, 28 mm larch decking, piled metal foundation | ||
Wood burning fireplace |